IPA GROUP offices in Italy: Headquarter in which is developed brick plats engineering and the production plant in which are produced heavy clay processing and brick production machines.
Offices in San Damiano d’ASTI – h
H ead office and brick plants production engineering division
Offices in Cadonoghe (Padova) – c
C lay processing machines production factory
Fornaci Joniche - Lattarico (CS) ITALY
Plant for the production of 210.000 tons/year of hollow and ceiling blocks
Ke.Be. - Nea Santa (Thessaloniki) GREECE
Plant for the production of 350.000 tons/year of hollow and ceiling blocks
ECO - CROAZIA
Fired product unloading by robot with pack re-formation
|